On August 13, 2014 wpd Canada applied to the Ontario Energy Board (OEB) for Leave to Construct a 28 kilometre high-voltage transmission line that would connect their planned Prince Edward County South Marysburgh and Athol 29 industrial wind turbine project to the IESO-controlled grid. Among others, APPEC applied for and was granted Intervenor status.

All the documents submitted by wpd Canada and the Intervenors (including APPEC) can be viewed on the OEB website under EBR 2013-0339. For the convenience of Prince Edward County residents the APPEC submission has also been posted on this website (Click here for the submission). 

 